Congratulations on the company's successful development of 3DS fully dynamic balance coupling


Release Time:

2021-09-15

In 2008, Shenke has developed a world-class 3DS fully dynamic balance coupling. With the on-site dynamic balance interface and phase magnetic strip preset technology, the unit shaft vibration can be completely solved with one drive. (Others, such as the most commonly used ternary dynamic balance method, need three to six times. Each driving cost is about 50,000 yuan)

In 2008, Shenke has developed a world-class 3DS fully dynamic balance coupling. With the on-site dynamic balance interface and phase magnetic strip preset technology, the unit shaft vibration can be completely solved with one drive. (Others, such as the most commonly used ternary dynamic balance method, need three to six times. Each driving cost is about 50,000 yuan)

Related News

undefined

undefined